PPS

Production planning and scheduling

 

Allocation

This was a long duration project due to the great scope and inclusion, covering from the initial production lines to the shipping, from the annual programming to minute to minute scheduling. Besides integration with other systems as the one that collected information of plant floor operation.

I carried out several functions during the project execution. The main one was Leader of the Material Realocation Module, in which I developed the solution, led the implementation team and I accomplished adjustments during the implantation period in the customer. I also aided in the design of the Cold Rolling Scheduler, in the creation of shipment module and in the maintenance of Inventory Application module.

HR

1996/08

-

1998/08

Consultant Specialist

1998/09

-

1999/01

GSI Designated

1999/02

-

2000/03

Associate Consultant

Roles

1996/08

-

1997/05

Solution architect

1997/06

-

1999/06

Module Technical Leader (MTL)

1999/06

-

2000/03

MTL and Programmer