PPS

Production planning and scheduling

 

Solutions that I had direct action

Figure:List of the modules that composes the solution. In red are the modules that I had direct action in their execution. In blue are the ones that didn't have any action.

Material reallocation module

I participated in all phases of the Material Realocation module, from data gathering to installation.

Phases

1996/08

-

1997/01

Data Gathering

1997/02

-

1997/05

Solution Design

1997/06

-

1999/06

Implementation/Tests

1999/06

-

2000/03

Installation

The table below has a list detailing my participation in each one of the phases of the development of the material realocation module.

My responsibilities in the material reallocation solution
Name Description

Data gathering

The information regarding my contributions in the execution of this phase are described in the solution for the material realocation.

Module creation

The information regarding my contributions to the module creation are described in the solution for the material realocation.

Implementation

I selected the development team members. I coordinated the module implementation in details in all of their characteristics: Graphic interface, communication, server component, implementation of the heuristics and database structure.

Tests, adjustments and installation

I accomplished several presentations of prototype versions along the project. I accomplished unity tests and integration ones. I accomplished adjustments in the code and I aided in the installation of the module.

Shipping module

This module was built using a product that was being developed in the United States. During the execution of the project I understood the operation of the product, the heuristics, the graphical interface, database structure and integration tables.

My responsibilities in the shipping solution
Name Description

Data gathering

The information regarding my contributions in the execution of this phase are described in the solution for the shipping area.

Focal point

I was the responsible for the understanding of the internal operation of the product developed in the United States, which is based on heuristics coordinated by a base structure called A-Teams. I accompanied the finalization of the graphic interface, of the server side and the data base.

Tests, adjustments and installation

I accomplished several presentations of prototype versions along the project. I accomplished unity tests and integration ones.

Cold rolling schedule module

Before starting this module there was a project in process for another customer that possessed similar characteristics. I studied the solution being implemented and made necessary adjustments to be able to use it in the cold rolling steel mill module. After finishing the design phase, I made interviews to compose the technical team that would implement the module.

My responsibilities in the cold rolling solution
Name Description

Data gathering

The information regarding my contributions in the execution of this phase are described in the solution for the cold rolling area.

Module design

The information regarding my contributions to the module design are described in the solution for the cold rolling area.

Inventory application module

My participation in the inventory module was only in the finalization of installation and some adjustments in the rules of the specialist system.

My responsibilities in the inventory application solution
Name Description

Maintenance and adaptations

I accomplished maintenances and adaptations of the rules of the module, which was implemented in a specialist system called AION.